Program design

Well test program design

Most test problems are built in before the first valve opens. The duration was set by the rig schedule, not by the radius of investigation. The gauges were whatever the vendor had on the truck. Nobody wrote down what the test had to prove, so nobody could say whether it did. Good well test design fixes that on paper, where it's cheap.

Request a program review
Drilling rig on location under an overcast sky
TEST PROGRAM · OUTLINE
01Objectives
02Test sequence
03Durations
04Rates & chokes
05Gauges & data acquisition
06Fluid sampling
07Surface equipment scope
08Data-quality acceptance criteria
09Contingencies
Start with the question the test has to answer

Start with the question the test has to answer

Every program we write starts with the objectives, stated plainly and ranked:

  • Is the zone productive, and at what rate?
  • What are permeability, skin and reservoir pressure?
  • Is there a boundary or a compartment inside the area that matters for development?
  • What is the fluid, and is the sample representative?
  • For injection and disposal wells: what can the formation take, and at what pressure does it start to fracture?

If an objective can't be met with the time, budget or equipment available, we say so up front, so the program can be changed or the expectation adjusted before money is spent.

What goes into the program

What goes into the program

  • Test sequence. Cleanup, flow periods, buildups or falloffs, and sampling points, in order, with the reason for each.
  • Durations. Flow and shut-in times sized to the objectives and expected reservoir properties, not to the rig schedule.
  • Rates and chokes. Target rates, choke steps and the limits that protect the well and the surface equipment.
  • Gauges and data acquisition. Gauge type, range, resolution, sample rate and placement, with backups where the data can't be repeated.
  • Fluid sampling. When and where to sample, and what to do to keep the sample representative.
  • Surface well testing equipment scope. Separator capacity, metering, flare or disposal, and sand handling sized to the expected flow.
  • Data-quality acceptance criteria. What a usable dataset looks like, written down, so field decisions have a standard to work from.
  • Contingencies. What to do if the well loads up, produces sand, doesn't clean up, or flows above or below plan.
Oil and gas well testing, and beyond

Oil and gas well testing, and beyond

The same approach applies to exploration and appraisal wells, production well testing and deliverability tests on existing wells, and injection, disposal, geothermal, helium and brine wells. The fluids and regulations change. The need for a clear objective and a test long enough to meet it doesn't.

Reviewing a program you already have

Reviewing a program you already have

If your team or a vendor has already drafted a program, we'll review it against your objectives and send back marked-up comments: what will work, what won't, and what it costs to fix. That's often the fastest way to start.

Regulatory requirements

Regulatory requirements

A test program has to satisfy the regulator as well as the reservoir engineer. Wherever the well is, we build that jurisdiction's test and reporting requirements into the program from the start, so the data you collect is the data you have to submit.

What you get

What you get

  • A written test program with objectives, sequence, durations, equipment and data specifications
  • A vendor scope you can bid or give to your preferred service company
  • A list of risks and contingencies for the field team
  • A call to walk through it with your engineering and operations people
Request a program review

Request a program review

Send us the well, the objectives and any draft program.

Request a program review