Wellsite oversight for surface testing, flowback and injection work
A good program only matters if it's run as written. On a busy location the pressure is always to shorten the shut-in, skip a choke step, or start the test before cleanup is done. Our job on location is to hold the line on the operator's objectives while working with the service company crew, not against it.
Request a program review
What we supervise
- Surface well testing. Separator testing, metering, sampling and flare management on exploration, appraisal and production well tests.
- Flowback testing and cleanup. Post-frac and post-workover flowback: rate and choke management, sand monitoring, load recovery tracking, and the transition to production testing.
- DFIT and mini-frac execution. Pumping schedule, gauge installation and shut-in discipline.
- Injection, injectivity and step-rate tests. Rate steps, stabilization, and recording the pressures that define fracture and injection limits.
- Inline, deliverability and AOF testing. Multipoint and inline deliverability tests on gas wells, including the stabilization criteria that make the AOF number meaningful.
Before mobilization: equipment and procedure audits
Before the crew rolls out, we review the vendor's job plan, equipment list and procedures against the program. Typical checks:
- Separator and metering capacity against the expected rates
- Gauge type, calibration records, resolution and clock sync
- Pressure ratings and certifications for the rig-up
- Sampling equipment and procedures
- Flare, storage and fluid disposal arrangements
- Site-specific safety and emergency response requirements, including H₂S where applicable
Gaps are written up for the operator and the vendor before the job starts, when they're still cheap to fix.
On location
- Daily reporting to the operator in a consistent format: what happened, rates and pressures, deviations from program, and decisions needed
- Making field calls within the program and escalating anything outside it
- Checking data as it's collected, so a bad gauge or a missed sample is caught on day one, not after rig-down
- Keeping the service company, the rig and the operator's office working from the same plan
After the job: field audit
Once the job is done we write a short field audit: was the program followed, where it changed and why, equipment or procedure problems, and what to change next time. It's written to help the next job go better, not to assign blame.
Who's on location
When the operator needs someone on location, we provide experienced on-site representation or supervisors from our network, matched to the type of work and the area, with one point of contact back to your office.